Log InCreate An Account
  1. Plugins
  2. »
  3. KV331 Audio
  4. »
  5. SynthMaster 3 Player iOS
  6. »
  7. Details

SynthMaster 3 Player iOS

iPad Preset Browser iPad In App Shop iPad Mix View iPad Track View iPad Sequence Editor iPad Drum Sequence Editor iPad Expanded Keyboard iPad FX Editor
SynthMaster 3 Player iOS by KV331 Audio is a Virtual Instrument Audio Plugin and a Mobile Audio App for iOS. It functions as an Audio Units Plugin.
Product
Version
1.0.4
iOS 14
Instrument
Formats

MyKVR: Groups, Versions, ...

6 KVR members have added SynthMaster 3 Player iOS to 3 MyKVR groups 7 times.

Download KVR Studio Manager (FREE)

Not In Your MY KVR Groups
(or group limitation prevents versioning)
+3 in private groups

KVR Rank

Overall: 4682   196

30-Day: 14905; 7-Day: 17747; Yesterday: 14068

{See video at top of page}

SynthMaster 3 Player iOS is the mobile player version of KV331 Audio's flagship synthesizer SynthMaster 3. It is tailored towards user who prefer tweaking existing presets over designing sounds from scratch. It is available for free on Apple AppStore as a standalone app and AUv3 plugin.

Features

  • Free Factory Content: SynthMaster 3 Player iOS comes with 200 presets curated from SynthMaster One, SynthMaster 2 and SynthMaster 3 factory libraries. Once users complete registration, the number of free presets increase to 500.
  • Rich Expansion Content: SynthMaster 3 Player iOS is compatible with SynthMaster One, SynthMaster 2 and SynthMaster 3 expansions. There are currently 60 expansion banks for a wide range of genres to choose from. Users can easily purchase these expansions through the In-App Shop inside the app.

  • Much more than a ROMpler synth: Although users can not edit layer modules and modulation sources, they can edit all other layer parts such as keyboard zones, velocity zones, voicing, unison, arpeggiator, sequencer and insert FX.
  • Multi-layer Architecture: Each SynthMaster 3 Player iOS instance can have up to 16 layers. Users can add new layers by loading existing presets into layers through the preset browser.

  • Preset Previews: Presets in SynthMaster 3 Player iOS have built-in previews. Users can listen to the previews of presets after turning on the preview mode.

  • In-App Shop: Users can easily purchase expansion banks as in-app-purchases.

Latest User Reviews

Average user rating of 0.00 from 0 reviews

Products similar to SynthMaster 3 Player iOS...

Comments & Discussion for KV331 Audio SynthMaster 3 Player iOS

Discussion
Discussion: Active

Please log in to join the discussion

Log In To KVR Audio